| Date | Item | Department | Description | Amount | Outcome |
|---|---|---|---|---|---|
| 03/13/24 | #35 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with SPS New England, Inc., Salisbury, MA, on the basis of a low bid of $107,559,567.35 for replacement of the State Red List bridge that | $107.6M | approved |
| 03/13/19 | #33 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with SPS New England Inc., Salisbury, MA, for the design-build replacement of the Bunker Creek Bridge over US Route 4 in Durham, on the ba | $7.1M | approved |
| 01/24/18 | #16 | DEPARTMENT OF TRANSPORTATION | Authorize to enter into a contract with SPS New England Inc., Salisbury, MA, for interim repairs to the Hampton Harbor bascule lift bridge carrying NH 1A over Hampton River, on the basis of a low bid | $432,800 | approved |